Contact Us
FETRION ELECTRONICS

Discover

From idea to field, together.

Mechanical installation control

Chiller, Heat Pump and Boiler Automation

Heating and cooling automation aims to meet the facility needs within the operating limits of the manufacturer's devices. Chiller, heat pump and boiler are different equipment; Even if they are connected to a common display, control permissions and security conditions are not the same.

Prepared by: Fetrion Electronics ·

Mechanical Automation system components

Manufacturer control and high-level automation

The device's own control can manage the compressor, combustion or freeze protection. Upper automation can send run permission, target temperature or request signal; Which commands are supported is checked in the device documentation. Manufacturer protections are not bypassed with an external controller.

Cascade and hydraulic layout

Points such as return and return temperature, outside air and tank temperature are selected according to the control scenario. Equipment stages, minimum operating times and heating-cooling transitions are defined. The pump, valve and hydraulic balance are evaluated together with the control; Incorrect installation layout cannot be corrected with software parameters.

Monitoring and maintenance records

Operating hours, number of on-off cycles, malfunctions and selected temperatures assist in maintenance inspection. Exact energy efficiency cannot be derived from on-screen operating time unless electricity or fuel consumption is measured separately. In the acceptance test, demand increase, equipment failure and backup device activation are verified.

Technical questions and answers

Is it possible to cascade between brands?

The device interface is evaluated by the hydraulic layout and manufacturer's permissions.

Does BMS manage the safety of the device?

High-level monitoring does not replace the safety functions of the device itself.

Is an outside air sensor mandatory?

It is determined according to the selected control strategy.

Is productivity calculated only from working hours?

No. Energy and appropriate thermal measurements are required.

You can use the site without turning on optional services.

Mandatory preference registration · Remembers your choice.

Cookie Policy · Personal Data Protection Notice